A panel is the part of a control system nobody looks at until something is wrong with it. We build them so that the day somebody does open the door — at 2am, during a breakdown, possibly not us — the drawing matches what is inside and every core is labelled at both ends.

Photograph pending · 3:2Panel interior close-up — ferruled wiring, DIN rail, terminal blocks, labelled loomspublic/photography/panel-interior-wiring.jpg

We design and build panels for plant utilities and process machinery — motor control centres, PLC panels, VFD panels, distributed I/O enclosures, marshalling cabinets and operator desks. Sizes run from a wall-mounted starter panel through to floor-standing multi-section boards.

Design starts on paper. You approve a general arrangement and a set of schematics before we buy hardware, which is the cheapest point at which to change your mind about a spare-ways allowance or a different drive brand.

What we design to

Enclosure
IP54 / IP55 painted steel, IP65 and 316 stainless for wash-down and corrosive duty
Segregation
Power, control and instrument routed separately; screened cores earthed at one end
Identification
Every core ferruled at both ends and matched to the schematic
Thermal
Heat load calculated per panel; fan, filter or cooling unit sized against worst-case ambient
Protection
Discrimination checked across the board, not assumed from the device catalogue

How a panel job runs

  1. Step 01

    Scope and site data

    I/O count, motor schedule, control philosophy, ambient conditions, incoming supply, and where the panel physically has to fit. If drawings exist for the plant it is joining, we want them.

  2. Step 02

    Design and approval

    GA, schematics and BOM issued for your comment. We do not order long-lead items until this is signed.

  3. Step 03

    Build and wiring

    Backplate assembly, wiring, ferruling and labelling in our Chennai workshop.

  4. Step 04

    Factory acceptance test

    Powered up on the bench against a written schedule — continuity, insulation, I/O forced point by point, interlocks proved. You are welcome to attend; most clients do it remotely by video.

  5. Step 05

    Despatch and site support

    Packed, delivered, and where you want it, positioned and terminated by our engineers rather than handed to a contractor with a drawing.

Photograph pending · 3:2A panel part-built on the bench with an engineer working on it, drawings visible alongsidepublic/photography/panel-build-in-progress.jpg
Panels are wired and tested in our own workshop rather than subcontracted, which is why we can commit to an FAT date.

Retrofitting into an existing board

Plenty of jobs are not a new panel at all — they are a new section, a controller swap or a drive replacement inside a board that has to be back in service on Monday. That work is scoped as a retrofit and planned around your shutdown window.

Questions we get asked

Next step

Have a control panel design & manufacture enquiry?

Send the plant detail — platform, I/O count, what has gone wrong, and the window you can give us. An engineer picks it up.

An engineer responds within one business day.