PLC-5 to ControlLogix migration on a fab's process cooling water plant
A semiconductor fab in Sriperumbudur
An obsolete PLC-5 running PCW for a tool bank, replaced over a single 14-hour window with a tested route back to the original system.
14 hrssingle shutdown window, no overrun
- Allen Bradley PLC-5
- ControlLogix
- FactoryTalk View SE